Genesis

From CSP.guru
Jump to: navigation, search



Basics

Status operating
Technology Trough
Capacity (MW) 250.0
Year operational 2014
Year of construction start 2010
City Blythe
Country USA
Coordinates 33° 40' 0", -114° 59' 0"
DNI (kWh/m2 year) 2917


Financials

Storage capacity (hours) 0.0
Field size (m2) 1928320
Cooling Dry
Expected generation (GWh/a) 580
Load factor (%) 0.2648
Total cost 1215
Specific investment cost (2015 USD) 4862
Specific investment cost (2015 EUR) 3657
Developer Genesis Solar, NextEra
HCE manufacturer
SCA manufacturer Sener
Financed through
Remuneration 16.344977440714032
Remuneration (2015 USD) 0.1770
Remuneration (2015 EUR) 0.1332
LCOE (5% WACC, 2015 USD) 0.1801
LCOE (10% WACC, 2015 USD) 0.2623
LCOE (5% WACC, 2015 EUR) 0.1355
LCOE (10% WACC, 2015 EUR) 0.1974
Other support Federal Loan Guarantee $852 million, 30% investment tax credit
Owner Genesis Solar
Support duration 25

Map

Loading map...

Links and sources

Enipedia ID
SolarPACES ID 54

Data sources

http://www.nrel.gov/csp/solarpaces/project_detail.cfm/projectID=54; http://www.energy.gov/lpo/genesis; http://www.greentechmedia.com/articles/read/250mw-genesis-thermal-solar-gets-852m-doe-loan; https://www.fitchratings.com/site/fitch-home/pressrelease?id=987168; https://en.wikipedia.org/wiki/Genesis_Solar_Energy_Project