Solana

From CSP.guru
Jump to: navigation, search



Basics

Status operating
Technology Trough
Capacity (MW) 250.0
Year operational 2013
Year of construction start 2010
City Phoenix
Country USA
Coordinates 32° 55' 0", -112° 58' 0"
DNI (kWh/m2 year) 2770


Financials

Storage capacity (hours) 6.0
Field size (m2) 2200000
Cooling Wet
Expected generation (GWh/a) 944
Load factor (%) 0.4311
Total cost 2000
Specific investment cost (2015 USD) 8116
Specific investment cost (2015 EUR) 6073
Developer Abengoa
HCE manufacturer Schott
SCA manufacturer Abengoa
Financed through
Remuneration 14 $c/kWh
Remuneration (2015 USD) 0.1420
Remuneration (2015 EUR) 0.1063
LCOE (5% WACC, 2015 USD) 0.1848
LCOE (10% WACC, 2015 USD) 0.2691
LCOE (5% WACC, 2015 EUR) 0.1382
LCOE (10% WACC, 2015 EUR) 0.2013
Other support Federal Loan Guarantee $1.45 billion, 30% investment tax credit
Owner Abengoa
Support duration 30

Map

Loading map...

Links and sources

Enipedia ID
SolarPACES ID 23

Data sources

http://www.nrel.gov/csp/solarpaces/project_detail.cfm/projectID=23; https://mitei.mit.edu/system/files/Chapter%203_compressed.pdf; http://www.abengoasolar.com/export/sites/abengoasolar/resources/pdf/Solana_factsheet_09092013.pdf